DANKETUAE
UAE · Estimates & proposals

Quotation calculator

Prepare an English commercial quotation for a Polyurea system or a combined SPF + Polyurea system. The preview updates as you type.

Quotation total -
System
Quotation details
Pricing

One area and rate cover the complete five-step Polyurea package.

SPF and Polyurea areas are independent, as required for combined projects.

SPF amount-
Polyurea amount-
Combo technical data
Polyurea technical data
Terms & notes
A4 quotation previewAll customer-facing content is in English
DANKET
DANKET PLUS INSULATION CONTRACTING L.L.C
Phone / WhatsApp: +971 58 255 9902
info@danketplus.com  |  www.danketplus.com
QUOTATION
WATERPROOFING &
THERMAL INSULATION
Quotation No.-Subject-
Client-Date-
Location-Validity15 days

SCOPE OF WORKS

NODESCRIPTIONUOMQTYRATEAMOUNT
1 SURFACE PREPARATION AND CRACK FILLINGThorough preparation and cleaning of the application surface, including removal of loose particles, dust and other contaminants. All visible cracks, joints and defective areas shall be properly opened where required and filled and sealed using suitable waterproof crack-filling material. ---
2EPOXY RESIN PRIMERSupply and application of one coat of high-quality epoxy resin primer over the prepared surface to provide proper adhesion, penetration and bonding between the existing substrate and the waterproofing system.
3POLYUREA WATERPROOFING MEMBRANESupply and spray application of a high-performance polyurea waterproofing membrane over the primed surface. The polyurea system shall provide a continuous, seamless and flexible waterproofing layer with resistance to water penetration, weathering and normal movement.
4ACRYLIC PROTECTIVE TOPCOATSupply and application of one final coat of high-quality acrylic protective topcoat over the polyurea membrane to provide additional UV resistance, weather protection and durability.Colour: white.
5CORNERS, UPSTANDS AND DETAILSProper treatment and waterproofing of corners, edges, joints, penetrations, upstands and other critical details to ensure continuity of the waterproofing system.
TOTAL AMOUNT (AED)
-

TERMS

Warranty10 years from the completion of work, covering watertightness, adhesion and membrane integrity under normal service conditions.
Payment Term50% Advance | 50% After Completion of Work
MeasurementMeasurement will be measurable at actual site conditions.

NOTES

  • The price includes all required costs for complete execution
  • Work will be carried out according to specified technical requirements
  • This quotation is valid for 15 days from the date of issue
  • All work will be carried out as per mutual understanding and agreement